A multi-purpose balancing reservoir project over Mekedatu, built at a cost of Rs 5,912, was aimed at solving the drinking water problems of Bengaluru and Ramnagar district. Via Top India News- News18.com https://ift.tt/2xHgTtr
A multi-purpose balancing reservoir project over Mekedatu, built at a cost of Rs 5,912, was aimed at solving the drinking water problems of Bengaluru and Ramnagar district. Via Top India News- News18.com https://ift.tt/2xHgTtr